
PM Surya Ghar in Telangana and Andhra Pradesh: a step-by-step guide
Who is eligible, how much you get, and what happens between your application and the subsidy reaching your bank account.
Get up to ₹78,000 subsidy under PM Surya Ghar. We install made-in-India panels, take care of the DISCOM paperwork and net meter, and back every installation with a 5-year workmanship warranty.
The subsidy is fixed by the Government of India and paid directly into your bank account after your system is inspected.
Direct subsidy
Direct subsidy
Maximum subsidy
We handle the national portal application, DISCOM approvals and net meter for you.
Net-meter and subsidy timelines depend on your DISCOM. We follow up with them until it’s done.
Our engineer checks your roof, shade and electricity bill.
You get a written proposal with system size, layout and final price.
We register you on the PM Surya Ghar portal and apply to your DISCOM.
Our own team completes installation within 10 days of order confirmation, subject to a 30% advance payment.
After the DISCOM inspection, the net meter is fitted and the subsidy is released to you.
In the past month, our teams installed 35 rooftop systems across these nine towns and cities in Telangana and Andhra Pradesh.
Installed in the last month.
Across Telangana and Andhra Pradesh.
On every installation.
Standard rooftop systems completed within 10 days of order confirmation, subject to a 30% advance payment.
Hyderabad · Office
Sangareddy
Warangal
Khammam
Vijayawada
Eluru
Dwaraka Tirumala
Kakinada
Pithapuram
Every system is built to the technical specifications in MNRE’s PM Surya Ghar guidelines.
Made-in-India (DCR) panels from MNRE’s approved list (ALMM) and BIS-certified inverters, so your subsidy is never rejected over equipment.
Hot-dip galvanised structure, copper solar cabling in conduit, three earth pits and a lightning arrester, as set out in MNRE’s technical specifications.
Our own engineers survey, design, install and commission your system. One point of contact for every question.
A 5-year workmanship warranty and a 10-year structural warranty from Lumisun; panels with a 12-year product warranty and a 25–30-year performance warranty; inverters with a 5–7-year manufacturer warranty.
Lumisun was founded in 2026, but the engineers, site teams and DISCOM liaison staff behind it have designed, built and commissioned rooftop solar across Telangana and Andhra Pradesh for years. That experience now works under one roof, and under one accountable contract.
Rooftop installations by our team
Homes, commercial buildings and industrial plants across Telangana and Andhra Pradesh.
Installed by our team members in previous roles
Industrial plants of 100–350 kWp
Delivered by our team members in previous roles.
Executed by our team members in their previous roles. Client names are withheld; references can be arranged with the client’s consent.
Kamareddy, Telangana
Nagarkurnool, Telangana
Telangana
Pashamylaram, Telangana
Our own engineers survey, design, install and commission your system. One point of contact for every question.
1 kW to 10 kW rooftop systems.
₹18,000/kW for common facilities.
Shops, schools, hospitals and factories.
AMC plans with remote monitoring.
Telangana & Andhra Pradesh
We register you on the national portal, apply to your DISCOM and follow up until the subsidy is credited to your account.
Your quote names the exact make and model of every component, so you can check it against the delivery documents.
ALMM-listed. DCR panels for home subsidy projects.
BIS-certified, with app monitoring.
Copper cabling, surge protection and earthing on every system.
Hot-dip galvanised steel or aluminium, designed for your local wind zone.
Straight answers on subsidy, timelines, power cuts and warranties.
₹30,000 for 1 kW, ₹60,000 for 2 kW and ₹78,000 for 3 kW and above. Apartment societies get ₹18,000 per kW for common facilities.
The subsidy is credited directly to your bank account by the government after the DISCOM inspects and approves your system. It is not paid to the installer.
For a standard rooftop, we complete installation within 10 days of order confirmation, subject to a 30% advance payment, and we meet that for more than 95% of our installations. Elevated structures or unusual roofs can take a few days more. DISCOM inspection, net-meter fitting and subsidy release then depend on your DISCOM; we follow up at every stage.
A correctly sized system can cover most of your consumption. Fixed and customer charges on the bill still apply under net metering.
On-grid systems switch off automatically during a grid outage. This is a safety requirement (anti-islanding) that protects linemen working on the lines. Battery backup can be added separately.
Panels carry a 12-year product warranty and a 25–30-year performance warranty from the manufacturer, depending on the brand. Inverters carry a 5–7-year manufacturer warranty, depending on the brand. Lumisun gives a 10-year warranty on the mounting structure and a 5-year workmanship warranty on the installation.

Who is eligible, how much you get, and what happens between your application and the subsidy reaching your bank account.

A simple way to size your system from the units on your electricity bill, and how much roof space you’ll need.

Both are made in India. The difference is where the cells come from, and it decides your subsidy.
Lumisun. Cleaner. Greener. Stronger.
Our engineer visits, checks your roof and bill, and gives you a fixed written quote.
Tell us a little about your home. Our engineer will call you to fix a convenient time.